Infrastructure

A factory built for consistency, not just volume

Cutting, sewing, finishing, packing and storage are laid out for single-piece flow, so a style moves through the floor without bottlenecks or handling damage.

Facilities

What sits inside our units

Factory floor

Naturally lit, ventilated production halls laid out for single-piece flow between cutting, sewing and finishing.

35,000 sq ft

Machinery

Juki single-needle, overlock, flatlock, feed-off-the-arm, bartack and buttonhole machines with regular preventive maintenance.

180+ machines

Production units

Dedicated lines for tees, polos, kidswear, fleece and home textiles so styles do not compete for the same operators.

6 lines

Warehouse

Racked fabric and trims storage with lot-wise segregation, plus a separate finished-goods staging area for cartons.

Lot-wise racking

Sampling & design office

In-house pattern making, grading and a sample room that turns protos in 7–12 days alongside bulk production.

7–12 day protos

Finishing & packing hall

Industrial steam pressing, thread trimming, needle detection, folding, stickering and carton packing stations.

Retail-ready

Production capacity

Numbers you can plan a season around

Monthly output
Up to 120,000 pcs
Tees & polos
70,000 pcs / month
Kidswear
30,000 pcs / month
Fleece & hoodies
20,000 pcs / month
Printing
12,000 impressions / day
Embroidery
20,000 logos / day

Inside the units

Our floor, photographed as it is

Main sewing hall
Main sewing hall
Juki single-needle lines
Juki single-needle lines
Overlock & flatlock stations
Overlock & flatlock stations
Finishing & packing hall
Finishing & packing hall